The trabzon port construction project of dussaud brothers (1870)

MakaleYalnız künye

Özet

Growing commercial activity in the second half of the 19th century revealed inadequate conditions of the Çömlekçi Port by which a great part of the Trabzon's trade realized in this period. The first infrastructure works was carried at the port during and after the Crimean War. But the construction of a port by a private company was also on the agenda. A French Engineering Company, Dussaud Brothers, prepared a large project that includes all infrastructure elements needed by the port and presented to the government in 1870. The company's offer was not accepted; but when we look at the subsequent port construction projects and the modern Trabzon Port completed in mid-20th century, it can easily be seen the impact of Dussaud's project. Based on the archival documents, this article aims to evaluate Dussaud Brothers' project under the previous and subsequent woks and to demonstrate the effects of the project.

Anahtar Kelimeler

RDL Kalıcı Bağlantı (PID)
https://rdlopen.rawdatalibrary.net/r/gumushane/18938Resmi atıflarda kullanılan kalıcı adres
Atıflar
TR Dizin
8
Her kaynağın kendi saydığı toplam atıf; aktarım ve zenginleştirme sırasında alındı.
Tam Kayıt
AlanDeğerDil
dc.contributor.authorYilmaz, Ozgur
dc.date.accessioned2026-10-22T10:45:52.058921570Z
dc.date.available2026-10-22T10:45:52.058921570Z
dc.date.issued2015
dc.description.abstractGrowing commercial activity in the second half of the 19th century revealed inadequate conditions of the Çömlekçi Port by which a great part of the Trabzon's trade realized in this period. The first infrastructure works was carried at the port during and after the Crimean War. But the construction of a port by a private company was also on the agenda. A French Engineering Company, Dussaud Brothers, prepared a large project that includes all infrastructure elements needed by the port and presented to the government in 1870. The company's offer was not accepted; but when we look at the subsequent port construction projects and the modern Trabzon Port completed in mid-20th century, it can easily be seen the impact of Dussaud's project. Based on the archival documents, this article aims to evaluate Dussaud Brothers' project under the previous and subsequent woks and to demonstrate the effects of the project.
dc.identifier.endpage244
dc.identifier.issn2146-4642
dc.identifier.issue18
dc.identifier.startpage213
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/gumushane/18938
dc.identifier.volume9
dc.language.isotr
dc.relation.ispartofKaradeniz İncelemeleri Dergisi
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.subjectMühendislik, Deniz
dc.subjectTarih
dc.subjectİnşaat Mühendisliği
dc.titleThe trabzon port construction project of dussaud brothers (1870)
dc.typeArticle
dspace.entity.typePublication
rdl.citation.trdizin8
rdl.source.indexTRDIZIN