Özet

Southeastern Anatolia Project (GAP) region in Turkey is rich in water for irrigation and hydroelectric power. The Euphrates and Tigris Rivers represent over 28% of the nation's water supply by rivers, and the economically irrigable areas in the region make up 20% of those for the entry country. Turkey has a total gross hydropower potential of 433 GWh/yr, but only 125 GWh/yr of the total hydroelectric potential of Turkey can be economically used. By the construction of new hydropower plants, 36% of the economically usable potential of the country would be tapped. The GAP region has a 22% share of the country's total hydroelectric potential, with plans for 22 dams and 19 hydroelectric power plants. Once completed, 27 billion kWh of electricity will be generated annually. (C) 2011 Elsevier Ltd. All rights reserved.

Anahtar Kelimeler

RDL Kalıcı Bağlantı (PID)
https://rdlopen.rawdatalibrary.net/r/gumushane/15870Resmi atıflarda kullanılan kalıcı adres
DOI
https://doi.org/10.1016/j.rser.2011.11.015Yayıncı resmi DOI adresi
Tam Kayıt
AlanDeğerDil
dc.contributor.authorAkpinar, A.
dc.contributor.authorKaygusuz, K.
dc.date.accessioned2026-10-22T10:26:10.105570651Z
dc.date.available2026-10-22T10:26:10.105570651Z
dc.date.issued2012-02
dc.description.abstractSoutheastern Anatolia Project (GAP) region in Turkey is rich in water for irrigation and hydroelectric power. The Euphrates and Tigris Rivers represent over 28% of the nation's water supply by rivers, and the economically irrigable areas in the region make up 20% of those for the entry country. Turkey has a total gross hydropower potential of 433 GWh/yr, but only 125 GWh/yr of the total hydroelectric potential of Turkey can be economically used. By the construction of new hydropower plants, 36% of the economically usable potential of the country would be tapped. The GAP region has a 22% share of the country's total hydroelectric potential, with plans for 22 dams and 19 hydroelectric power plants. Once completed, 27 billion kWh of electricity will be generated annually. (C) 2011 Elsevier Ltd. All rights reserved.
dc.identifier.doi10.1016/j.rser.2011.11.015
dc.identifier.endpage1156
dc.identifier.issn1364-0321
dc.identifier.issue2
dc.identifier.startpage1146
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/gumushane/15870
dc.identifier.volume16
dc.identifier.wosWOS:000300205200007
dc.language.isoen
dc.publisherPERGAMON-ELSEVIER SCIENCE LTD
dc.relation.ispartofRENEWABLE & SUSTAINABLE ENERGY REVIEWS
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.subjectSoutheastern Anatolia Project (GAP)
dc.subjectHydroelectric
dc.subjectWater resources
dc.subjectTurkey
dc.subject.classificationGreen & Sustainable Science & Technology
dc.subject.classificationEnergy & Fuels
dc.subject.classificationScience & Technology - Other Topics
dc.subject.otherRENEWABLE ENERGY
dc.subject.otherHYDROPOWER
dc.titleRETRACTED: Regional sustainable water and energy development projects: A case of Southeastern Anatolia Project (GAP) in Turkey (Retracted article. See vol. 83, pg. 173, 2018)
dc.typeReview Article
dspace.entity.typePublication
rdl.citation.openalex15
rdl.citation.wos11
rdl.oa.statusclosed
rdl.sdgSDG07
rdl.sdgSDG06
rdl.sdgSDG09
rdl.sdgSDG13
rdl.source.indexWOS
rdl.wos.indexScience Citation Index Expanded (SCI-EXPANDED)