<?xml version="1.0" encoding="UTF-8"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-10-23T17:55:38Z</responseDate><request verb="GetRecord" identifier="oai:gumushane-rdlopen.rawdatalibrary.net:gumushane/18073" metadataPrefix="oai_dc">https://gumushane-rdlopen.rawdatalibrary.net/oai/request</request><GetRecord><record><header><identifier>oai:gumushane-rdlopen.rawdatalibrary.net:gumushane/18073</identifier><datestamp>2026-10-22T11:39:18Z</datestamp><setSpec>openaire</setSpec><setSpec>driver</setSpec><setSpec>com_gumushane_10000</setSpec><setSpec>col_gumushane_10001</setSpec></header><metadata><oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><dc:title>A Comparative Study of Machine Learning and Deep Learning for Time Series Forecasting: A Case Study of Choosing the Best Prediction Model for Turkey Electricity Production</dc:title><dc:creator>Ünlü, Ramazan Erkin</dc:creator><dc:subject>Bilgisayar Bilimleri, Yazılım Mühendisliği</dc:subject><dc:description>Over the last decades, Turkey pays special attention to electricity productionto afford its needs. Researchers applied different methodologies including statisticalbased and artificial intelligence-based to correctly predict the future amount of electricityproduction, consumption, and demand. However,limited researchers focused on Turkey’selectricity production prediction problem as a time series analysis. For this reason, wetackle this problem by considering it as a time series analysis in this study. We haveused different methods including traditional machine learning algorithms Support VectorRegression (SVR) and Multilayer Perceptrons (MLP) and a deep learning algorithm LongShort-Term Memory (LSTM) to create a better model for Turkey monthly electricityproduction dataset. Based on our findings LSTM outperforms SVR and MLP approachesin terms of commonly used statistical error evaluation metrics</dc:description><dc:date>2019</dc:date><dc:type>Article</dc:type><dc:identifier>https://rdlopen.rawdatalibrary.net/r/gumushane/18073</dc:identifier><dc:identifier>https://doi.org/10.19113/sdufenbed.494396</dc:identifier><dc:identifier>1300-7688</dc:identifier><dc:language>en</dc:language><dc:relation>Süleyman Demirel Üniversitesi Fen Bilimleri Enstitüsü Dergisi</dc:relation><dc:rights>info:eu-repo/semantics/openAccess</dc:rights><dc:type>info:eu-repo/semantics/article</dc:type><dc:identifier>https://gumushane-rdlopen.rawdatalibrary.net/tr/items/gumushane/18073</dc:identifier></oai_dc:dc></metadata></record></GetRecord></OAI-PMH>